Which survey
The wrong survey is the expensive mistake, not the wrong surveyor.
An ALTA bought for a fence costs several times what the fence needed. A boundary survey bought for a closing gets rejected and bought again. Both happen weekly in this valley.
“I want to build a fence and not annoy my neighbour”
You need
Boundary survey
You need the corners marked on the ground, and you want them marked before the posts go in rather than after.
Not this · Not an ALTA. It costs several times more and shows you things a fence does not care about.
- Timing
- 1 day in the field, 1–2 weeks in the office
“I am buying a commercial building and my lender sent a list”
You need
ALTA/NSPS land title survey
That list is the ALTA optional table. It is the one survey written for lenders and title companies rather than for owners.
Not this · Not a boundary survey — it will be rejected, and you will pay twice.
- Timing
- 2–4 days in the field, 3–5 weeks in the office
“My architect says they need the site before they can draw”
You need
Topographic survey
They need contours and a CAD file, not corners. Ask them for the contour interval and the format before you ring us.
Not this · Not a boundary survey, though the two are often bought together.
- Timing
- 1–3 days in the field, 1–2 weeks in the office
“I want to split five acres off for my daughter”
You need
Subdivision plat
A county will not record a split without a plat, and the plat is the long pole — reviews take months, not weeks.
Not this · Not a quick boundary survey with a line drawn on it. That is not a legal division of anything.
- Timing
- Weeks in the field, months through review
“The excavator is on site Monday and needs corners”
You need
Construction staking
Staking puts the approved design on the ground. It assumes there is an approved design.
Not this · If there is no design yet, what you need is a topographic survey and an engineer.
- Timing
- Booked in visits, usually 3–6 across a job
“My flood insurance premium jumped and they want a form”
You need
Elevation certificate
Specifically the FEMA elevation certificate. It is a form, not a drawing, and it is a smaller job than anything else here.
Not this · You do not need a boundary survey to get one, whatever the insurer's letter implies.
- Timing
- Half a day in the field, under a week in the office
If none of the six is your week, ring and describe it. Working out which survey you need is not billable and never has been.
Request a quotation