A fixed figure per phase, agreed before that phase starts.

Fee and duration for each design phase, and what you own if you stop after it
PhaseFeeDurationYou own
1Feasibility$2,4002 – 3 weeksHand sketches and a site diagram
2Schematic design$9,5006 – 8 weeksPlans, elevations, and one section, at 1/8 inch
3Design development$14,0008 – 10 weeksPlans and sections at 1/4 inch, plus material selections
4Permit and construction drawings$22,00010 – 14 weeksThe full set: details at 1½ inch, schedules, and specifications
5Construction administration$1,900 a monthFor the length of the buildSite observation notes, sketches answering questions

Figures are for a typical single-family project and are confirmed in writing before each phase begins. Consultants — structural, survey, energy — are engaged by you directly and are not in these figures.

Also offered

A single consultation

$450

Two hours, at the house or on the lot, for people whose real question is whether the thing is possible and roughly what it involves. No drawings, no obligation, and about a third of them end with me saying do not do it.

Measured survey of an existing house

From $3,200

For an older house with no drawings. Measured, drawn, and given to you as a set you own whether or not you go on with a project.

Why not a percentage

A percentage rewards a bigger building
If my fee rises with your construction cost, every expensive decision quietly pays me. Phase fees remove that entirely.
Nobody knows the construction cost at the start
Quoting a percentage of an unknown number is quoting a range and calling it a fee.
You can stop
A percentage contract makes stopping a negotiation. Phase fees make it a decision you were always allowed to make.
It makes the phases real
If each one has to be worth its own fee, none of them can be padding. That discipline is on my side of the line, not yours.