Skip to content

Questions

Five, and the third one is the expensive misunderstanding.

How are your fees worked out?
Per phase, as a fixed figure agreed before that phase starts. Most architects quote a percentage of construction cost, which is a number nobody knows at the start and which quietly rewards a more expensive building. Phase fees mean you can price each step, and stop after any of them.
Can I stop after the first phase?
Yes, and people do. Each phase produces drawings you own outright — feasibility tells you whether the project is possible at all, schematic design gives you something a builder can price roughly. Stopping is a normal outcome rather than a failed project, and one client came back eighteen months later and started again at phase two.
Do you do the building work as well?
No. I draw and I do not build, and the distinction matters more than it sounds: your builder is hired by you, under a contract with you, and I am the person checking their work against the drawings rather than checking my own. An architect who is also the contractor cannot do that second job, whatever they say.
How long does permitting take here?
It depends entirely on the jurisdiction and it is their clock rather than mine — some reviews here run six weeks and some run five months, and the same drawings can get either. I will tell you what the current experience has been in your jurisdiction, and I will not promise you a date that is not mine to promise.
What do you need from me to start?
The address, a survey if one exists, and an honest budget range. The budget is the one people withhold and it is the one that matters most — a design drawn without it is a design that gets value-engineered into something worse six months later.

Permit timelines described here are the jurisdiction’s experience rather than a commitment, and no construction cost on this site is a quotation.

All sitesback to the Crown Media directory