Skip to content

Documentation

Every step recorded, and the limits of that record stated.

  1. 01

    Site assessment note

    Before collection

    What is there, what we will take, what we will not, and how it comes out of the building. Sent to you in writing before anything is scheduled.

  2. 02

    Collection manifest

    At pickup

    Itemised list of what left your site, signed by your representative and our driver. Both parties keep a copy.

  3. 03

    Weight ticket

    Within 24 hours

    Certified scale weights with grades listed separately, so you can see how the total was reached rather than being handed one number.

  4. 04

    Settlement statement

    With payment

    Weight, grade, index price used, and the date it was applied. If the market moved between pickup and processing, you can see which day we priced against.

  5. 05

    Downstream summary

    On request

    Which qualified partner received each material stream. This is a record of where material went — it is not a certificate of recycling, and we do not issue one.

What our documentation is not.

This section exists because getting it wrong would cost you a compliance finding, not us.

Not a certificate of recycling

Our downstream summary records which qualified partner received each material stream. It is a record of where material went. It does not certify how that partner processed it, and it should not be filed as though it does.

Not a certificate of data destruction

We are not a certified electronics recycler and we do not issue data-destruction certificates. If your policy or your clients require one, use a certified provider for data-bearing equipment. Ask us and we will name one — we would rather lose that portion of the job than have you assume a cover you do not have.

Not a hazardous-waste manifest

EcoCycle holds no hazardous-waste permit. Our collection manifest covers the non-hazardous material we removed and nothing else.

All sitesback to the Crown Media directory